Skype Skype Me™!, tel. (044) 228-18-35, e-mail: kimo.biz at gmail.com
English  Русский 

CHOOSE YOUR LANGUAGE

Catalog

Blog / News

22.10.2012 20:43:55
23.08.2011
03.11.2009
Subscribe for email newsletter (blog):
or RSS 2.0

Survey

Printer friendly version Printer friendly version

17.4. A test report in the flow of water

Rate it

SPP "KIMO-Business"
23.08.2011 Kiev city

The T V E P R D A N

Director of Small Private Enterprises
"KIMO-Business"
Sergey Goncharenko
_______________ SP Goncharenko

A C T

Verify that the sample
Experimental vetrogidroustanovki WHD-2 / 0.29
on Bortnichskoy Aeration Station, Kiev

The Commission consists of:

Chairman of the Commission, Deputy Director, Department of
Operating kanalizitsionnogo economy
Head Bortnichskoy Aeration Station
Vladimir Brazhnik

Commission members:

Chief engineer
Bortnichskoy Aeration Station
Grubrin Vladimir S.

Head of the Department of hydropower
Institute for Renewable Energy
National Academy of Sciences of Ukraine, Doctor of Technical Sciences
Peter Vasko Fedoseevich

Head of Department and gidrobioniki
boundary layer control of the Institute
Hydromechanics of NAS of Ukraine,
Prof.
Voropaev Gennady A.

Head Cleaning Bortnichskoy
Station number 2 (BOS-2)
Kubicki, Sergei Ivanovich

Zam. Director of the Small Private
Enterprises "KIMO-Business"
Oleg Goncharenko

appointed by order of the small private enterprise "KIMO-Business" from 19.08.2011, № 11 / 8, the channel discharge treated wastewater treatment plant Bortnichskoy number 2 (BOS-2) Bortnichskoy Aeration Station tested verify that the sample experienced vetro-gidro device WHD-2 / 0.29, designed to convert the kinetic energy of the fluid flow into electrical energy during flutter vibrations of work items, developed and manufactured by SPE "KIMO-BUSINESS."

Tests were carried out in accordance with the program and test procedure WHD-2.PT during 23.08.2011 was, at the same time revealed the following:

1. Sample experimental vetrogidroustanovki WHD-2 / 0.29, designed to convert the kinetic energy of the fluid flow into electrical oscillations at Flutter Baby items, is workable.
   2.C increase in the number of work items are withdrawn from the generator increases power and efficiency of the plants at a constant rate of water flow.
   3. Specifications are using a permanent magnet generator (rated speed of rotation and the rated power) does not correspond to the characteristics of the unit.

The Commission recommends that:

   1. Find the generator specifications of which correspond to characteristics of the unit.
   2. Perform re-testing plants for water flow.
   3. Re-testing to:
       - With different quantities of work items;
       - When the area of ​​the subjects of work items;

Appendix:

The test report performance of the sample experienced vetrogidroustanovki WHD-2 / 0.29, designed to convert the kinetic energy of the fluid flow into electrical energy from 23.08.2011g. 8 sheets.

Chairman: ________________ Brazhnik V.S.

Members: ________________ Grubrin V.S.
                  ________________ Vasko P.F.
                  ________________ Voropaev G.A.
                  ________________ Kubicki S. I.
                  ________________ Goncharenko O.P.

Any questions?

Please use the following form to request information.

Your name:

Email

Please specify your question about 17.4. A test report in the flow of water:


Type the numbers you see in the picture below
code

© .